Patapsco Waste Water Treatment Plant Arc Flash Improvements

July 31, 2021 BDE ADMIN

Patapsco Waste Water Treatment Plant Arc Flash Improvements

Design, supply, programming and management of medium voltage switchgear upgrades at Patapsco WWTP. BDE LLC was involved in assisting Sidhu, the electrical engineer, to design the remote breaker control cabinets. BDE, LLC also complted the systems study of the entire facility to find out the arc incident energy of the equipment. We removed (12) existing Eaton DC relays and replaced them with (12) Eaton FP-5000 Arc Mitigating relays. In installing the relays, (12) Eaton VacClad switchgear cells were modified to accept the new relay and terminations were made to external remote breaker control panels. 34kV ABB Type V pedestal breakers were also modified to have arc mitigation protection and a remote breaker control cabinet. BDE, LLC also added remote racking to SqD PZ3 style switchgear. We trained the facility on the usage of this racking.

Don’t make facile assumptions about red meat and coors light ridiculousness…be a #climatedad…the generations after you will thank you…the leadership ⁦@blackstardellc⁩ is taking being a #climatedads seriously as we shift to renewables!

#Recordbreaking…let’s not walk blindly into a #disaster…#renewableenergy is critical to our existence…firms like ⁦@blackstardellc⁩ are investing in our renewable future…what are YOU doing?

Load More...

More BDE Projects

27 Oct 2024

Howard University Downing Hall Chiller Upgrades (Washington, DC)

BDE partners with JST Power Equipment, JW Frew Electric, and Shepherd Electric Supply to provide a pre-assembled unit substation for Howard University’s Downing Hall. This cost-effective solution streamlines installation and supports essential HVAC upgrades, overcoming challenges to deliver enhanced electrical infrastructure on time. Learn more about this impactful collaboration.

Blackstar
Diversified

New Orleans, LA

10836 Chef Menteur Highway
New Orleans, LA 70127
(504) 265-9919