Fort Meade WWTP Generator Control Panel Replacement

July 31, 2021 BDE ADMIN

Fort Meade WWTP Generator Control Panel Replacement

Design, supply, installation and management of custom generator control panel at Fort Meade Waste Water Treatment Plant. Coordination System Study Analysis found the circuit breaker in the existing generator control panel to be deficient. After realizing there were more deficiencies within the control panel, the owner requested BDE LLC to design and supply a new control panel to work with the existing Caterpillar generator. As a solution, BDE LLC then commissioned a month long study of the existing power conditions at the facility along with analyzing the features of the existing control panel. We then designed a new control system that would allow the generator to start in half the time of the old system, provide local HMI control capability, offer SCADA connectivity to the plants mainframe and coordinate properly with the upstream switchgear ATS.

Don’t make facile assumptions about red meat and coors light ridiculousness…be a #climatedad…the generations after you will thank you…the leadership ⁦@blackstardellc⁩ is taking being a #climatedads seriously as we shift to renewables!

#Recordbreaking…let’s not walk blindly into a #disaster…#renewableenergy is critical to our existence…firms like ⁦@blackstardellc⁩ are investing in our renewable future…what are YOU doing?

Load More...

More BDE Projects

27 Oct 2024

Howard University Downing Hall Chiller Upgrades (Washington, DC)

BDE partners with JST Power Equipment, JW Frew Electric, and Shepherd Electric Supply to provide a pre-assembled unit substation for Howard University’s Downing Hall. This cost-effective solution streamlines installation and supports essential HVAC upgrades, overcoming challenges to deliver enhanced electrical infrastructure on time. Learn more about this impactful collaboration.

Blackstar
Diversified

New Orleans, LA

10836 Chef Menteur Highway
New Orleans, LA 70127
(504) 265-9919