BDE partnered with JST Power Equipment to deliver a quick-ship NEMA 3R MetalClad switchgear lineup for the NWI Aerostructures facility in Nashville, Tennessee.
The project required a fast turnaround to align with the facility’s annual maintenance shutdown. JST provided a custom outdoor switchgear lineup with advanced relays and breakers. During testing, cable length modifications were identified and resolved prior to shipment to ensure rapid energization upon arrival.
Through close coordination with Phalcon USA and Harlan Electric, the system was successfully delivered and installed on schedule, supporting critical industrial power upgrades without extended downtime.
.png)

• Coordinated multi-partner engineering review
• Delivered quick-ship NEMA 3R MetalClad switchgear
• Identified and resolved cable length adjustments before shipment
• Installed during scheduled maintenance window
• Streamlined commissioning for rapid energization
• Reduced installation time through pre-engineered configuration
• Prevented downtime beyond scheduled maintenance window
• Improved electrical reliability for aerospace manufacturing operations
• Delivered seamless upgrade under tight industrial timelines