Description
1. Job name: W9127825R0020; Substation (Primary 4), Redstone Arsenal, AL
2. Job location: Arsenal, AL
3. Synopsis of scope: Work includes the substation, transformers, primary and secondary voltage switchgear with associated distribution loop, cable vault, control room and all associated duct banks with cabling
4. Bidding/due date: Apr. 14, 2025
5. Project Details: https://drive.google.com/drive/folders/1iTBViIVwPRFiUm4LHhbN-w3sqPZkPC0r?usp=drive_link
6. Links:
March 6 Update: Solicitation
7. Notes: March 20 - Addendum 1 Solicitation. Replace section 00. Uploaded pre-proposal site-visit.