Montebello Filtration Plant 1 Improvements (Baltimore, MD)

Blackstar Diversified Enterprises partnered with Whiting-Turner Construction, Curtis Power Solutions, and SAI Advanced Power Solutions to deliver a customized generator and utility power paralleling system for the Montebello Filtration Plant 1 Improvements project in Baltimore, Maryland.

The project required the design, supply, and management of a medium voltage generator paralleling system to support one of Baltimore City's primary water treatment facilities. BDE provided a custom 15kV metal-clad switchgear lineup, integrated transformers, and engineered control systems to ensure seamless power transition and uninterrupted facility operations.

The system was engineered to manage:

  • (2) 2000A BGE utility feeders
  • 1.5MW Low Voltage Generator
  • 1.5MW Load Bank

The custom control system was specifically designed to prevent backfeeding of the sensitive BGE incoming power while maintaining uninterrupted power transfer in the event of voltage drop or utility fluctuations.

Project Scope

  • Medium Voltage Generator Paralleling System Design
  • Custom 15kV Metal-Clad Switchgear Integration
  • Transformer Coordination and System Protection
  • Utility Power Interconnection Engineering
  • Generator Control System Programming
  • Load Bank Integration
  • Commissioning & Operational Validation

Engineering Approach

BDE applied an engineering-first integration model to ensure:

  • Seamless transition between generator and utility sources
  • Protection of sensitive utility infrastructure
  • Compliance with municipal reliability standards
  • Long-term operational resilience for critical public health systems

Results

  • Increased grid reliability for a primary municipal water facility
  • Enhanced resiliency during utility interruptions
  • Secure non-backfeeding design protecting BGE infrastructure
  • Long-term stability for Baltimore’s water treatment operations