In collaboration with JST Power Equipment, JW Frew Electric, and Shepherd Electric, BDE delivered a pre-assembled medium voltage unit substation supporting HVAC and infrastructure upgrades at Howard University.
By replacing a traditional stick-built approach with a space-efficient pre-assembled system, the team reduced installation time, improved cost efficiency, and streamlined integration with existing Siemens switchgear.
The project demonstrates BDE’s ability to coordinate complex institutional power upgrades with minimal disruption.
.png)
.png)
• Coordinated equipment specifications with JST Power Equipment
• Evaluated space constraints within the existing facility
• Implemented a pre-assembled medium voltage unit substation design
• Integrated directly with existing Siemens switchgear systems
• Reduced installation complexity and site disruption
• Reduced installation time compared to traditional stick-built construction
• Improved cost efficiency through pre-engineered system design
• Minimized disruption to university operations
• Streamlined integration with existing electrical infrastructure
• Delivered reliable medium voltage performance for critical facility upgrades