Drainage Pumping Station 5 – Cast Coil Transformer Installation

BDE partnered with JST Power Equipment to deliver and install a 750kVA cast coil transformer for a critical City of New Orleans water pumping facility.

Designed for hurricane preparedness and flood resilience, the transformer was engineered to operate reliably under demanding municipal conditions.

Despite supply chain constraints, the unit was delivered and installed within days, reinforcing infrastructure reliability for essential city operations.

Process was

• Coordinated transformer design and delivery requirements with JST Power Equipment

• Engineered a cast coil solution suited for harsh municipal operating conditions

• Supported installation planning and site readiness

• Managed timeline constraints to reduce operational risk

• Delivered equipment aligned with storm resilience and emergency preparedness goals

Main results

• Improved power reliability for critical pumping infrastructure

• Strengthened hurricane preparedness and flood response capability

• Delivered a purpose-built transformer solution under tight timelines

• Reduced operational risk through rapid installation readiness

• Reinforced resilience for essential municipal services