tunnel

February 6, 2023

H.008145 – LA 1: LEEVILLE TO GOLDEN MEADOW (PHASE 2)

Description

CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, PERMANENT SHEETING, PRECAST CONCRETE PILES, STEEL PILES, CONCRETE SLAB SPAN BRIDGE, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE, DRILLED SHAFT FOUNDATIONS, ALTERNATE 1: 65' SPANS WITH 24" PPC PILES, PRECAST CONCRETE PILES(24”), PRECAST PRESTRESSED CONCRETE MEMBERS; ALTERNATE 2A: 108' SPANS WITH 24" PPC PILES, PRECAST CONCRETE PILES(24”), PRECAST PRESTRESSED CONCRETE MEMBERS; ALTERNATE 2B: 108' SPANS WITH 30" PPC PILES PRECAST CONCRETE PILES(30”), PRECAST PRESTRESSED CONCRETE MEMBERS; AND RELATED WORK.

Location: Leeville, LA 70357, USA

Due Date: 10-06-2021 16:00:10

Attachments:


Partner with us



Blackstar
Diversified

New Orleans, LA

10836 Chef Menteur Highway
New Orleans, LA 70127
(504) 910-6897